Speciality Projects

This project required a few months of design to remove Spray Booms from a two-story building. The drawing below shows the design criteria and removal of the Spray Booms. There was design of equipment and platforms.

Bridge Jacking

Bridge Jacking

Jacking bridge sections and LRT sections are projects we have done for a long time. The LRT section weighs 1200 ton. This drawing is for lifting the LRT sections. Jacking Anthony Henday and Whitemud bridge. Bridge weighs 600 ton. This bridge was designed for an off ramp. Drawing below.