Gantry Systems

Formula/Bradley Engineering has designed gantry systems for multiple applications. One of the applications that was a challenge and required a different design was for a drilling ship.

Ship Gantry System

Many other factors come into the design such as movement of the ship and location and amount of support locations. The design was to vertically lift equipment to the top of the module assembly and then move horizontally to the center of the ship. Many factors were required for the design.