This project required a few months of design to remove Spray Booms from a two-story building. The drawing below shows the design criteria and removal of the Spray Booms. There was design of equipment and platforms.
You may also like
This project was very interesting, each floor of the tower had to be removed in sections. These sections had to meet the […]
Jack and Slide of this tower placed a lot of stress on the sliding equipment. The vessel was 30’-0” in diameter and […]
This vessel was small but it was located in a very difficult location for removal. This vessel was vertical, standing over two […]
This project entailed a Concrete Stack in a permanent structure. This concrete stack was a one-piece design and too large to remove […]